PROJECT DETAILS
CUSTOMER: ONNANS PMA France
TYPOLOGY: PAINT BOOTH / FLASH OFF ZONE/ OVEN
INDUSTRY: AEROSPACE
A custom built project (paint room / flash off rooms / oven)
In a restrictive space with all the required and continuous control of temperature / pressure / humidity.
THE CHALLENGE
This french company specialized in surface treatment in the aerospace busines.
The project included a complete installation of paint, evaporation and drying oven.
We must develop a project as placing the entire facility in a space defined by the customer.
SOLUTION
Custom Design and Manufacturing of equipments in order to fit them in an existing space.
This french company specialized in surface treatment in the aerospace business has inaugurated its new production site in MARSEILLE ( Paint room for 3 painters at the time , Flash off room , Baking room) .
According to the constraints of the available space with many columns and beams, all the components of the project had to be designed from the beginning in order to respect the sizing requirements of the customer.
The initial project included the air generating group located onto the plenum of the paint booth but the dimensions of this unit did not match the height problem.
We made the choice of installing the 40.000 m3/h air unit on top of the building at 15 meters height with the modules of humidity and temperature. In spite of the distance and the complexity of assembling on site , it was the best choice to win space , to reduce the noise level, and to review the expectancies of the customer in terms of dimensions. Absolute control of all the working parameters, and their traceability by a 6 channel HONEYWELL recorder: a total success.